Quality Control
Quality checks tied to approved project documents.
Inspection points are organized around confirmed drawings, schedules, samples and quotation requirements rather than a generic checklist.
Project-based coordination
The final supply is defined by confirmed documents and quotation.
United States project notes
Project planning for the United States market.
Coordinate the supply scope against the project documents, site conditions and delivery plan required for the United States destination.
Send the opening schedule in inches or millimetres, with rough openings, quantities, handing and interface details clearly identified.
Identify thermal, acoustic, wind, water, air, safety-glazing and coastal or severe-weather requirements where they apply to the project.
List requested test reports, submittals, labels, packing method, delivery city and site constraints before the order is confirmed.
Applicable codes, approvals and performance documents must be confirmed for the specific project and authority having jurisdiction.